The government’s renewal plans reserve space for a bridge but provide no plan to build it. The Eveleigh Bridge Alliance is fighting to turn that “reserved space” into a reality. We are advocating for a safe, modern pedestrian and cycle link that honors the 2004 promise.
Pedestrian & Cycling Access
Community Connection
Economic Growth
Generational Legacy
| The Barrier | Current Reality | With the Bridge |
|
Walk Time (Carriageworks to South Eveleigh) Walk Time Darlington Public School student to Alexandria Park Community High School Walk Time Sydney Uni Business School to Commonwealth Bank South Eveleigh |
16 Minutes 28 minutes 1,400 m |
< 5 Minutes <22 Minutes / 19 min 680m |
| Full Barrier Length | 3.5 Kilometres | Reconnected (Barrier is reduced but there is still 2.3 km from Carriageworks to the LES via Macdonald town so not sure how to put this |
| Night Access | Add 5 minutes to walk time when Redfern Station Southern Concourse is closed. | 24/7 Connectivity |
| Car Dependency | High (due to detours) | Low (Active travel focus) |
We are working alongside government, local organisations, and the community to make this a reality.